Repair Green Ramp, North (Phase II)

Project Location: Pope AAF, Ft. Bragg, NC

Project Size: $16 Million

Project Manager: Randy Scott

rscott@rcconst.net

Work for this project includes:

Full depth replacement of northern portion of Green Ramp.  Removal of existing concrete pavement, replacement of underground storm drain system, new underdrain system, new aggregate base course separation layer, rapid draining material drainage layer, and 13" PCC pavement.  Replace emergency fuel stops around the perimeter of the apron and full depth replacement of apron shoulders and troop walks from Pax Sheds to Green Ramp.