top of page
Range Safety Improvements
Project Location:
Range Safety Improvements
![output-onlinepngtools.png](https://static.wixstatic.com/media/ff557d_2219ebdb6aa246ff9ab47772b8896e2d~mv2.png/v1/fill/w_340,h_199,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/output-onlinepngtools.png)
![output-onlinepngtools.png](https://static.wixstatic.com/media/ff557d_fe6e347b9d004e94bed4d49376c00cd9~mv2.png/v1/fill/w_351,h_199,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/output-onlinepngtools.png)
![output-onlinepngtools.png](https://static.wixstatic.com/media/ff557d_713072c09991489997e87ce61d281662~mv2.png/v1/fill/w_292,h_199,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/output-onlinepngtools.png)
Project Location:
Parris Island, South Carolina
Project Size:
$21 Million
Project Manager:
Zeb O'Bryant
Work for this project includes:
Replacement of the existing range furnishing, infrastructure and facilities; construction of an impact berm; replacement of the side safety berm; relocation of the firing line and target berms; access tunnel; buildings (target storage, butt house, and heads); and incidental related work.
bottom of page