Repair Failed/Failing Airfield Pavement, Phase II

Project Location:

Repair Failed/Failing Airfield Pavement, Phase II

output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png
output-onlinepngtools.png

Project Location:

Pope Army Airfield, Ft.Bragg, NC

Project Size:

$13.5 Million

Project Manager:

Jay Warren

​

​

Work for this project includes:

This project is a design/build full-depth replacement of CLAW Ramp. ADC Engineering will be our design partner for the contract. The project consists of full depth removal of CLAW Ramp pavements, replacement of the existing storm drain system, new base course, drainage layer, and concrete pavement.